Thomond Student Village

Project Summary
Fusion has constructed the purpose built Thomond Student Village for ‘Limerick Institute of Technology’. Thomond comprises of 115 three bedroom apartments and is recognised for its exceptional design and facilities throughout Ireland.

Client: John Fleming Construction

Location:
Limerick.

Architect: John McMahon and Partners, Limerick.

Number of Apartment Blocks: 23

Total Apartment Units: 190

Area:
    90, 000 sq. ft.

Fusion Build Time: 17 weeks on-site.

Construction
First Floor: Compartment floor comprises of 254mm steel joist, on 20mm OSB decking.

Floating floor: 30mm 200kg rockfloor with 20mm OSB decking.  Under side of floor constructed of 2 layers of 15mm firecheck plasterboard, counter battened for services and finished with 12.5mm slab.

Walls: External walls incorporate Fusion StIF Panel Technology. All load bearing and non load bearing walls are constructed of Fusion LGS stud and track.

Roof: Timber roof truss.
 

 
 
Copyright 2008 Fusion Building Systems Website by: basecreative