Project Summary: This development comprised of a mix of 3 and 4 bedroom semi-detached houses along with 3-bed terraced houses.
Client: Philip O’Connor.
Architect: O’Sullivan Campbell Architects
Location: Kenmare, Co. Kerry.
No. of Units: 112
Area: 140,000 sq.ft.
Build Time: 40 weeks
Construction: Residential dwellings incorporating ‘Fusion Therma Shield 162’ factory insulated external wall panel system, Fusion internal light gauge steel frame walls to accommodate Fusion light gauge steel joist flooring.
|