Project Summary An exclusive development of Detached Houses on the Western fringe of Cork City.
Client: John Fleming Construction.
Location: Waterfall, Co. Cork.
Architect: Hogan Associates, Cork.
Number of House Types: 2
Total Units: 57
Area: 138, 135 sq. ft./1, 2833 sq. m.
Fusion Build Time: 28 weeks on-site.
Construction First Floor: Steel Joists. Walls: External walls incorporate Fusion StIF Panel Technology. All load bearing and non load bearing walls are constructed of Fusion LGS stud and track. Roof: Timber roof truss.