Fusion Building Systems Homepage Latest News from Fusion Building Systems Contact Fusion Building Systems Sitemap
Ireland Developments
Untitled Document
 
Untitled Document
 
Clonliffe Road Residential

Client:  Brian Molloy

Location: Dublin City Centre.

No. of Units: 11 units

Area: 15,000 sq.ft.

Fusion Build Time:  5 weeks

Construction: 
‘Fusion Therma Shield 162’ external wall panel system, Fusion internal light gauge steel frame walls to accommodate light gauge steel joist flooring.  This development was complex in terms of design consisting of large glazed areas.  Fusion designed, fabricated and erected the Hot Rolled Steel structure to integrate with the Fusion light gauge steel frame system.
 

 
 
Copyright 2008 Fusion Building Systems Website by: basecreative