Fusion Building Systems Homepage Latest News from Fusion Building Systems Contact Fusion Building Systems Sitemap
Ireland Developments
Untitled Document
 
Untitled Document
 
CSPCA Cat & Dog Home

Project Summary:
A contemporary animal care home constructed for Cork Society for the Prevention of Cruelty to Animals (CSPCA).

Client: Bowen Construction

Architect: Boyd Barrett Murphy & O’Connor Architects

Location: Mahon, Co. Cork.

Area: 6,500 sq. ft.

Build Time: 4 weeks

Construction:
‘Fusion Therma Shield 162’ factory insulated external wall panel system, Fusion internal light gauge steel frame walls to accommodate composite concrete deck flooring.  The Fusion system was designed to accommodate large glazer areas, lightweight external cladding and masonry outer leaf as required by the architect’s design.  Significant quantities of Hot Rolled Steel (HRS) were required for this structure; all HRS was designed, fabricated and erected on site by Fusion.  The metal deck roof was also designed, supplied and erected by Fusion.
 

 
 
Copyright 2008 Fusion Building Systems Website by: basecreative